DOD SR400D Spezifikationen Seite 63

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 244
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 62
55
 c. Connect the outer pesticide feed line to the base
of the tank, along the top of the discharge tube,
through the inline cutoff valve, to the nozzle.
 d. With the engine off, (remember that the pesticide
flow is gravity fed), examine the system for leaks
by adding approximately 1 quart of water to the
tank and opening the inline flow valve, located
midway along the discharge tube, and the
volume control cock located on top of the nozzle.
Tighten all leaking areas as required and then
drain any remaining water from the system. BE
SURE TO PURGE THE WATER FROM THE
PESTICIDE LINE.
SET-UP PROCEDURES FOR ULV OPERATIONS
To conduct ULV operations, you must purchase a special
ULV nozzle system.
 2. a. Set up the unit into the mist spray configuration
as described above.
 b. Remove the mist spray nozzle and replace it with
the ULV nozzle and slide bar.
 c. Ensure that the ULV pesticide volume control
knob is in the off position.
Seitenansicht 62
1 2 ... 58 59 60 61 62 63 64 65 66 67 68 ... 243 244

Kommentare zu diesen Handbüchern

Keine Kommentare