208
PACU-9 PRE-FLIGHT PROCEDURES
24. Install the PACU-9 unit according to the above
instructions.
25. HAND-check all lines and connections for tightness
and leaks.
26. Load a funnel and two empty 5gallon cans (with
one spout or funnel) for backup to the pump.
27. Have two separate containers of flushing solution
with 2-3 gallons in each.
28. Ensure that ALL of the safety gear, flight helmets,
calibration jugs, a calibrated graduate cylinder,
spare rags, a hand pump, and the appropriate
tools are present.
29. Put on all personal protective gear.
30. Fill the pesticide tank by using a transfer pump,
power or hand driven. This pump is an essential
requirement for filling the tank in UH-1 aircraft.
Because of greater cabin height, the UH-3 allows
for filling the tank directly from cans if necessary.
In either case, the most rapid and efficient method
of filling is by means of a 28-volt motor driven low-
pressure fuel pump operated from an auxiliary
power unit.
31. Add the EXACT amount of pesticide required for
the mission. Plan on using all of the material
Kommentare zu diesen Handbüchern