174
18. YOU ARE NOW READY FOR ULV
APPLICATION.
19. Before attempting to calibrate, remove the
pesticide line at the nozzle and place it into a
suitable container, i.e., a 3-gallon formulation
bucket. Turn on the CV warm-up by moving the
toggle switch located on the remote operator's
station to the fog position.
20. To calibrate the machine set the flow rate on the
digital readout by adjusting flow rate screws. First
set "course" flow rate (after loosening knurled
knob), then set "fine" adjustment. (to convert to
"pesticide label" requirements use, approximately
30 ml = 1 oz.)
21. The rate of speed during the spray operation is
generally 5 or 10 MPH. The correct speed for
each type of pesticide is written on the pesticide
label.
22. When stopping for a short period of time, turn off
the "fogging" switch, found at the remote
operator's station.
TERMINATING PROCEDURES
23. After completing your spray operation, turn the
toggle switch on the remote operator's to the flush
position.
Kommentare zu diesen Handbüchern